top of page
Search

Wilten secures third project with Graftongate at G Park, Swindon


Wilten has been appointed to deliver a new industrial and logistics development at G Park, Swindon, marking its third project with repeat client Graftongate in the last three years.


The latest instruction further strengthens the established partnership between the two companies, with a continued focus on delivering high-quality, future-ready logistics space through collaborative working.


Project overview


The scheme comprises the design and build of a single industrial unit totalling 80,920 sq ft at G Park, Swindon.


Designed to meet modern occupier requirements, the facility will deliver a high-performance logistics space with a strong focus on efficiency, flexibility and sustainability.


Key features include:


  • Single-storey warehouse with integral first-floor office accommodation and CAT A fit-out

  • 12.5m clear internal height

  • 16 dock loading doors

  • 2 level access doors


The project has a construction value of £7.9 million and is being delivered alongside Graftongate, Knight Webb, UMC Architects and Burrows Graham.


Sustainability and design approach

Sustainability is a core driver of the scheme, with the development targeting BREEAM ‘Very Good’ and EPC A ratings.


Key environmental measures include:


  • PV-ready roof infrastructure for future solar installation

  • 9 EV charging bays

  • Low-carbon and energy-efficient design principles

  • Enhanced natural lighting to reduce energy use and improve occupier wellbeing

  • Cycle storage facilities and pedestrian-friendly external layouts

  • Biodiversity-focused landscaping across the site


Construction methodology will also focus on reducing waste, improving resource efficiency, and minimising environmental impact throughout delivery.


Social value commitment


Alongside environmental performance, the project includes a strong social value programme, including:


  • Engagement with local schools and colleges

  • Support for community groups and charities through donations and initiatives

  • Inclusive community engagement programmes


Continued partnership


This third project award reinforces the long-standing relationship between Wilten and Graftongate and their shared commitment to delivering modern, sustainable industrial developments that support economic growth and occupier demand.


Construction is now underway, with the scheme set to contribute further high-quality logistics space within the Swindon market.


 
 
bottom of page